For many project-led construction and property businesses, headcount is a straightforward way to work out how much office space you need. More employees means more desks, more floor space and, usually, higher overheads.

The trouble is, headcount only tells you how many people work for the business. It doesn’t always tell you what those people need office space for. 

A fairly quiet week of individual project work can quickly turn into back-to-back design reviews, client meetings and consultant sessions as a job reaches a busier stage. The number of employees hasn’t changed, but the demands on the office certainly have.

So, rather than basing your next office move entirely on desk count, it’s worth looking at your live project pipeline to help determine what you need office space for.

Different project stages require different types of space

The way teams work can change significantly as a construction project progresses.

The RIBA Plan of Work organises the process of briefing, designing, constructing and operating a building into eight stages, with different outcomes, core tasks and information exchanges at every point. 

This framework can be a helpful starting point when working out what your office actually needs. Rather than estimating space from headcount alone, look back at three or four recent projects and map how the office was used as each one moved through the pipeline.

For each stage, make a note of:

  • How many people were regularly working from the office
  • How often external consultants or clients visited
  • The size and frequency of project meetings
  • Did teams need to review drawings, models or programmes together
  • How long any particularly busy period lasted

You may find that the pressure points are surprisingly consistent. Once you’ve done this for a few projects, turn those patterns into a simple space profile for each stage. For example, Technical Design may regularly need a larger project room and drawing-review space, while the construction stage requires fewer permanent desks because more of the team is on site.

That gives you something much more useful than a headcount. Instead of simply saying “we need office space for 30 people”, you can start building a brief around what those people actually need, such as 20 desks, a project room for eight, and somewhere suitable for consultant reviews.

If that exercise shows that your biggest space requirements only appear during certain project stages, it may not make sense to size your permanent office around those peaks. This is where flexible office space can become a competitive advantage. If project demand rises and falls throughout the year, having more choice over office size, meeting space and contract terms can give you room to adapt without permanently building your workplace around the busiest week in the calendar.

It’s worth comparing different options before committing. Flexible workspace providers such as BizSpace and Spaces offer offices in different sizes and formats, and services such as Savills and commercial property marketplaces like Movehut can help you explore what else is available across different locations.

Look beyond floor space when assessing office needs

An office doesn’t necessarily become too small when you run out of desks. Sometimes, there are still plenty of workstations available while project managers are struggling to book suitable rooms for design reviews, consultant meetings and client discussions. In construction, projects rely on different disciplines being able to coordinate effectively. 

Before deciding you need more overall floor space, spend a few weeks looking at why your meeting rooms are under pressure rather than simply how often they’re booked.

You might find several different problems hiding behind a busy calendar. An eight-person design review in a room built for four is a capacity problem. Teams repeatedly booking the largest room because it has the only suitable screen is an equipment problem. 

Once you know what’s causing the pressure, you can fix the right problem. More floor space won’t help much if every project team still needs the only room with a suitable screen. Likewise, adding several small meeting rooms won’t solve a recurring need for larger multidisciplinary reviews.

Client-facing space deserves the same attention. Clear communication and discussing decisions throughout complex projects are key to managing client expectations during a major refurbishment. If those conversations are a regular part of project delivery, having somewhere suitable to hold them should form part of the office space brief rather than being treated as an afterthought.

When you compare office space, look at the mix of rooms and facilities alongside the overall floor area. A slightly smaller office with the right project rooms, client meeting space and equipment could be far more useful than a larger open-plan floor filled with extra desks.

Manage temporary project rooms effectively

If you’re going to create a temporary project space, give it a clear purpose before the team moves in.

If the room will mainly be used for model and drawing reviews, make sure the screen, table space and layout suit that type of work. If samples, programmes or current actions need to stay visible between meetings, decide where they will live rather than letting the room slowly fill up as the project progresses.

Give the project room an end point. That might be a planning submission, design freeze or another agreed project milestone. Once it has been reached, reset the space so it can be used by the next team rather than allowing a temporary project room to quietly become permanent.

Plan for project peaks, not average occupancy

Average office occupancy can still be useful, but project-led businesses also need to think about what happens when several important dates line up.

Plot your confirmed and likely projects over the next six to twelve months, paying particular attention to the stages that usually place more pressure on the office. That could include tender preparation, design workshops, planning submissions, client reviews or project handovers. Once those projects are on the same timeline, decide in advance what would trigger the need for extra capacity.

Your trigger could be as simple as two concurrent teams needing project space, more attendees than your largest meeting room can comfortably accommodate, or a project phase that needs additional workspace for several weeks rather than a single day.

Deciding those limits in advance means you’re not trying to solve the problem on Monday morning when three teams suddenly need the same room. The aim isn’t to build your permanent office around the busiest week of the year. It’s to know what your normal setup can comfortably handle and have a plan for the occasions when your project pipeline asks more of it.

Final thoughts

Looking at how projects move through different stages, where meeting-space pressure appears and when several busy periods are likely to overlap gives you a much clearer idea of what your office space actually needs to do.

It’s important to get the permanent setup right for everyday project delivery, while having enough flexibility to handle periods when your projects demand more.

Looking for more on property design and innovative layouts? Read more articles on BUILD.